Heavy Lifting Engineer Job in Delft, Zuid Holland Netherlands
In June 2010, Allseas awarded the contract for building its 382-m long, 117-m wide dynamically positioned (DP) platform installation / decommissioning and pipelay vessel Pieter Schelte to the Korean shipyard Daewoo.Long-lead items, such as the power generation equipment, the thrusters and the DP system, were ordered in 2007. In 2008, the high-tensile steel for the jacket and topsides lift systems was ordered. The detail design of the hull was completed in May 2010, while the lift systems and the pipelay system are foreseen to be ordered in the spring and summer of 2011. When built, Pieter Schelte Read more […]